educator
Financial Accountability Survey
tease

Follow us...  
Twitter Flickr You Tube Logo facebook

How Do I...


No Child Left Behind (NCLB) Monitoring

 

The Division of Program Monitoring and Interventions (PMI) develops and implements intervention processes for certain No Child Left Behind (NCLB)  programs statewide that promote program effectiveness and improved student performance, and monitor compliance with requirements for students served.

Intervention Activities 

TEA monitoring and intervention activities focus on a data-driven and performance-based system that takes place in a continuous improvement model. Activities reflect an emphasis on data integrity, data analysis, needs assessment, improvement planning, implementation, monitoring, progress reporting, and improved student performance and program effectiveness. The system for TEA monitoring is referenced as the Performance-Based Monitoring (PBM) system. The PBM system reflects the use of integrated interventions based on Local Education Agency (LEA) performance as evidenced by the Performance-Based Monitoring Analysis System (PBMAS) indicators.  Results on each PBMAS indicator and patterns across indicators were examined to determine required levels of intervention. 

A district staged for interventions in the PBM system must identify a District Coordinator for School Improvement (DCSI) who will serve as a member of the District Leadership Team (DLT). The DLT is responsible for conducting intervention activities (required and suggested participants are listed in the Texas Accountability Intervention System (TAIS) Guidance document). If the LEA has previously formed a DLT due to identification for state accountability interventions, the LEA will be required to add members with expertise in NCLB.  LEAs are required to collect and analyze data to identify areas for program improvement. Intervention guidance and resources are available to assist LEAs in conducting the required NCLB interventions.

Texas Accountability Intervention System 

All LEAs staged for PBM interventions will engage in the TAIS. The TAIS is supported by multiple research‐based resources/documents that guide districts and campuses through school improvement. As the state transitions to a more aligned accountability system, the focus shifts to a more integrated process for continuous, sustained improvement. The following districts and campuses will engage in TAIS Interventions:

  • Districts and campuses rated Improvement Required (IR) due to low performance on one or more of the four indexes of the performance index framework;
  • Districts and campuses who miss one or more System Safeguard targets; and/or
  • Districts staged for interventions in the Performance‐Based Monitoring (PBM) system, which includes multiple and single program areas staged for interventions.

The level of support a district/campus receives will be determined by:

  • the current and longitudinal accountability ratings;
  • the current and longitudinal history of the PBM stage(s) of intervention; and
  • the system with the highest level of intervention

Texas Accountability Intervention System (TAIS) Guidance (PDF, 568KB)         

On-site Review 

A targeted on-site investigation by the TEA will be conducted to address concerns related to documented substantial, imminent, or ongoing risks as reflected in current and/or longitudinal local education agency (LEA) data. The authority to conduct on-site investigations is found in Texas Education Code (TEC) §39.056, On-Site Investigations, TEC §39.057, Special Accreditation Investigations, 19 Texas Administrative Code (TAC) §97. 1071, Special Program Performance: Intervention Stages, 19 TAC §97.1072, Residential Facility Monitoring: Determinations, Investigations, and Sanctions, and, if applicable, conditions of the charter school contract and federal statutes and guidelines. The LEA will receive a preliminary on-site report of findings following the on-site review. The report must be presented to the governing board and the LEA must carry out the required actions of the report.

An LEA may be required to develop or update an improvement plan in response to both the visit and any other required data review activities. Findings from all data analysis activities must be included in the Improvement Plan.  

The on-site procedures manual provides information regarding on-site reviews.

NCLB Initial Compliance Review

Through the initial compliance review (ICR), the TEA annually assesses compliance with funding and reporting requirements for programs funded through the NCLB Act. When noncompliance is identified the LEA is required to engage in a process for determining and correcting the causal factors for the noncompliance. ICR Guidance and Resources-link are available to assist districts in conducting the required activities.

 

Page last modified on 11/26/2013 02:56:42 PM.